What Is Actually Included in a Turnkey Granny Flat Price?

Last reviewed: August 2026

Turnkey should mean the granny flat is finished to the point where you can unlock the door and move in, with nothing left to arrange or pay for. In practice the word is not regulated and builders apply it differently. Two turnkey quotes for the same building can sit $30,000 apart purely because of what each one leaves out.

This is the checklist to run both quotes against.

The test for a genuine turnkey price

Ask one question: on handover day, is there anything I still have to buy, arrange or pay for before someone can live here?

If the answer includes floor coverings, a driveway, a clothesline or a connection fee, it is not turnkey. It is a build price with a turnkey label.

What should be in the price

The building itself

Item Should be included
Engineered slab and footings Yes, designed to your soil classification
Frame, roof and external cladding Yes
Windows and external doors, including locks Yes
Insulation to walls and ceiling Yes, to BASIX requirements
Internal walls, doors and skirting Yes
Painting, internal and external Yes

Kitchen and bathroom

Item Should be included
Kitchen cabinetry and benchtop Yes
Oven, cooktop and rangehood Yes
Sink and tapware Yes
Bathroom fit-out, including vanity, toilet, shower Yes
Wall and floor tiling to wet areas Yes
Hot water system Yes
Laundry tub and washing machine connections Yes

The parts most often missing

This is the list worth going through line by line, because these are where quotes diverge.

Item Frequently excluded Why it matters
Floor coverings throughout Yes Carpet and flooring across 60m² is a real cost
Window furnishings Yes Blinds throughout add up quickly
Driveway and pathways Yes Often several thousand dollars
Fencing and gates Yes Especially separating the two dwellings
Clothesline and letterbox Yes Small, but required for a rental to be liveable
Landscaping and turf Yes Also affects your landscaped area compliance
Air conditioning Yes Often quoted as an upgrade
Insect screens Yes Commonly an add-on
Site costs and excavation Yes The single biggest variable
Utility connection fees Yes Water, sewer, power and NBN
Council or certifier fees Sometimes Depends whether approval is in scope

Approvals and paperwork

Some builders quote the build only and leave you to organise approval. Others manage the whole thing. Neither is wrong, but you cannot compare the two on price until you know which model you are looking at.

A complete approvals scope includes the survey, soil test, engineering, BASIX certificate, drafting, the certifier or council application, and the fees. BlueGum manages both CDC and DA approvals in-house.

Site costs deserve their own conversation

Site costs are the most common reason a fixed price stops being fixed.

A builder cannot price excavation, rock removal, retaining or service runs properly without inspecting your block. So a quote issued before a site inspection has either estimated those items, or excluded them, or capped them with a provisional sum that gets adjusted later.

Ask directly: has a site inspection been done, and are site costs fixed or provisional? A provisional sum is not dishonest, but you need to know it is there.

How to compare two quotes fairly

Put them side by side and normalise them before you look at the totals.

  1. List every item from the tables above
  2. Mark each one included, excluded or provisional on both quotes
  3. Price the excluded items on the cheaper quote at market rates
  4. Add that to the cheaper quote’s total

The quote that looked $25,000 cheaper often is not, once floor coverings, driveway, fencing and connections go back in. Sometimes it genuinely is cheaper, and now you know that too.

The questions that settle it

  • Is this price fixed, and what specifically can change it?
  • Has someone inspected my block before this number was produced?
  • Which items are provisional sums, and what happens if they are exceeded?
  • Are approval fees inside or outside this price?
  • What is the full list of exclusions, in writing?

That last question matters more than any other. A builder who will put the exclusion list in writing is telling you they have nothing to hide. One who will not has answered you anyway.

Frequently asked questions

Is turnkey a legally defined term?

No. There is no regulated definition, which is exactly why the inclusion list matters more than the label. Two builders can both accurately call their product turnkey and deliver very different scopes.

Should floor coverings be included in a turnkey price?

In a genuine turnkey price, yes. A home without flooring is not ready to move into. It is one of the most commonly excluded items, so check it specifically rather than assuming.

What is a provisional sum?

An allowance for work that cannot be priced exactly until it starts, most commonly excavation and site works. If the actual cost comes in higher, you pay the difference. It is a legitimate tool, but a quote heavy with provisional sums is not really a fixed price.

Are utility connections usually included?

Often not. Connecting water, sewer, power and NBN carries authority fees, and if a main needs upgrading the cost can be significant. Ask whether connections are included and whether any upgrade cost is capped.

Do I need to pay for approvals on top?

It depends entirely on the builder’s model. Ask whether the quote includes the survey, soil test, engineering, BASIX, drafting and the certifier or council fees, or whether those sit with you.

Get an inclusion list you can actually check

The fastest way to tell a real turnkey price from a labelled one is to read the inclusions and the exclusions together.

See what BlueGum includes as standard, or call 1300 060 651 to talk through your block.

BlueGum Granny Flats is a licensed NSW builder, licence number 247388C, and a member of the Housing Industry Association. This article is general guidance on comparing quotes and is not a quote or a statement of any particular builder’s scope.