
Private open space of 12 m², with a minimum dimension of 3 m. This is the control that most often forces a redesign at Council, because a long thin strip down the side does not count.

Takes 60 seconds. No obligation.





We build in 2 Strathfield Council suburbs: Strathfield South and Greenacre.
Greenacre is split. Part of it sits in Strathfield Council and part sits in Canterbury-Bankstown, and the 2 councils have different plans, different contributions and different DCP controls. Which one you deal with comes down to your actual address, not the suburb name, so check that first before you read any further.
Our office is in Padstow, a short drive from both.
This decides which of the rules below apply to you, and most granny flat pages never tell you.
About 9 out of 10 granny flats are built on the fast pathway, called complying development. A private certifier checks your plans against a fixed state checklist and issues the approval. Council is not involved in the decision.
The other 1 in 10 goes to Council as a development application, usually because something about the block fails the checklist.
Read the DCP row again, because it is the one that catches people. Every setback, private open space figure, height rule and parking control further down this page comes from Strathfield’s development control plan. None of it binds a private certifier. If you are on the fast pathway, a builder quoting you Strathfield DCP setbacks is quoting the wrong rulebook.
The same goes for the 1 September 2026 changeover. That is a change to the council’s own plan, so it changes what Council assesses. It does not change what a certifier assesses.
What does apply on the fast pathway is the state checklist, and that is the same in Strathfield South as it is in Penrith. The council specific rules on this page matter most if you end up at Council.
The state default cap on a granny flat is 60 m². Strathfield is one of the councils where that is not always the final number.
Clause 5.4(9) of the Strathfield Local Environmental Plan 2012 allows a floor area, excluding parking area, of whichever is the greater of:
60 m²
20%
of the total floor area of your existing house
The 20% option only beats 60 m² once your house is larger than 300 m². That is a big house, but it is not a rare one in this area, so it is worth doing the sum before you assume 60 m² is your ceiling.
Which pathway can use it, and it matters. This uplift is confirmed for a development application to Strathfield Council. It has not been confirmed on the fast complying development pathway, where a private certifier signs off instead of Council. A certifier may not accept anything above 60 m² here.
Only 3 councils we have researched have the uplift confirmed on the fast pathway: Liverpool, Shellharbour, and Blacktown inside its growth precincts. Strathfield is not one of them.
Since about 9 in 10 granny flats go the fast way, the practical answer for most people in Strathfield is that 60 m² is the number. If your plan depends on more than 60 m², budget and design for the council pathway and the months that add, and do not let anyone tell you a certifier will wave it through without confirming it for your block first.
Two more things sit underneath all of this:
Strathfield charges a section 7.11 developer contribution under its Direct Development Contributions Plan 2010-2030. “Secondary dwelling” is an explicit line in that plan, rated at 2.1 persons.
The rate depends on which of 9 precincts your block falls in.
All figures from Council’s indexed and capped rate sheet published September 2025. Rates are indexed, so confirm the current figure before you commit to a budget. No contribution exceeds $20,000 per dwelling, because the plan is capped at that amount.
Two things people get caught by:
Everything in this section and the next comes from Strathfield’s development control plan, which means it applies only if you go to Council. A private certifier issuing a complying development certificate does not apply any of it. If you are among the 9 in 10 going the fast way, read this for context rather than as your rulebook.
Right now the operative rules are Strathfield Consolidated DCP 2005, Part A section 12.2.1, in force since 8 September 2020. These are the ones Council applies to anything lodged before 1 September 2026.

Private open space of 12 m², with a minimum dimension of 3 m. This is the control that most often forces a redesign at Council, because a long thin strip down the side does not count.

Setbacks: 3 m from a secondary frontage, 1.5 m to the side, 3 m to the rear.

It goes at the rear. The granny flat sits behind the primary dwelling and is accessed from the same street.

Deep soil planting is required in the rear setback, so that space cannot be paved out.

No attached garages or carports. Council does not require any additional parking or a new driveway for the granny flat, which saves money, but under the current controls you cannot bolt a garage onto it either.

Five site-specific DCPs override the general rules where they conflict. They are DCP 13 Strathfield Town Centre, DCP 14 Davidson Street Greenacre, DCP 20 Parramatta Road Corridor, DCP 25 Courallie Avenue Homebush West and DCP 26 Pilgrim Avenue and Albert Road Strathfield. DCP 14 covers Davidson Street in Greenacre, so if that is your street, the general controls above are not the last word. These are separate documents and are not affected by the 1 September 2026 changeover.
Strathfield adopted its General Residential DCP on 28 July 2026. It is not a brand new standalone plan. It is Amendment No. 1 folded into the Strathfield Consolidated DCP 2005, and from 1 September 2026 it replaces Part A (dwelling houses and ancillary structures), Part B (dual occupancy) and Part C (multiple unit housing).
Every other part of the 2005 plan keeps running as it is, including the waste, tree, heritage, urban design and subdivision parts.
Applications lodged with Council before 1 September 2026 are saved under the old rules. Anything lodged on or after that date is assessed under the new ones. Again, this is a council document, so it only bites on the council pathway.
Secondary dwellings sit in Section 13 of the new plan, and the plan’s own structure table says they are subject to Sections 1 to 13. In plain English, the general residential controls apply to you as well as the secondary dwelling ones.

Two changes worth planning around.
Private open space halves, from 12 m² to 6 m². A block that cannot meet 12 m² today may work comfortably after 1 September 2026, so on a tight site the lodgement date is a design decision, not just paperwork.
The 6 m separation from the house is brand new and has no old equivalent. On a shallow lot it is the single biggest new constraint, because it eats 6 m of depth that the old plan let you use. If your block is short front to back, lodging before 1 September 2026 may be worth more to you than the private open space saving.
One item we have deliberately not settled. The new plan gives detached granny flats a 3 m rear setback in Section 13, but an earlier section sets a much larger rear setback in R2 and says it applies to all developments. The plan says Section 13 applies “in addition to” the earlier sections, which does not clearly say which one wins, and Council’s own guidance is to ring the Duty Planner where sections conflict. We are not going to publish a flat 3 m rear setback for the post September position until Council confirms it. If your design depends on a 3 m rear setback after 1 September 2026, get it in writing from Council first.
There is no numeric bedroom cap anywhere in Strathfield’s planning controls, and there never has been. On the fast pathway that is the end of the answer, because the state checklist does not cap bedrooms either.
On the council pathway, from 1 September 2026, there may be a practical ceiling that does the same job.
Section 9 of the new DCP sets minimum internal areas for dwellings: 35 m² for a studio, 50 m² for one bedroom, 70 m² for 2 bedrooms and 90 m² for 3 or more, plus 5 m² for each extra bathroom. The plan’s structure table says secondary dwellings are subject to Sections 1 to 13, so on a straight reading Section 9 catches them.
If that reading is right, a 2-bedroom granny flat needs 70 m² internal, which is more than the 60 m² default cap allows. It would mean 2 bedrooms only works at Council where clause 5.4(9) gets you to at least 70 m², and that needs an existing house of about 350 m² or more.
We have not had that reading confirmed by Council, and we are not going to state it as settled. It is a big claim and Section 9 does not name secondary dwellings. A DCP is also a policy, not law, and Council can vary it on merit. If you want 2 bedrooms on the council pathway and your house is under 350 m², that is a conversation to have with Council early, not after you have paid for drawings.
We have built 2 granny flats in this council area, one in Strathfield South and one in Greenacre.
That is a small number and we would rather say so than pad it. Strathfield is a small council area, and we have built seventeen in Canterbury-Bankstown next door, which shares the Greenacre boundary. The build is the same. The planning controls are what change at the boundary, and those are set out above.
Only if you go to Council, and only if your house is big enough. Clause 5.4(9) of the LEP allows the greater of 60 m² or 20% of your existing house, so a house above 300 m² unlocks more than 60 m². That is confirmed for a development application to Council. It has not been confirmed for the fast complying development pathway, so do not assume a private certifier will approve it. For the 9 in 10 who use a certifier, plan on 60 m².
Both routes exist. If your block meets every standard in the state Housing SEPP, a private certifier can issue a complying development certificate without going to Council, and none of Strathfield’s own DCP controls apply. If it does not, you lodge a development application with Strathfield Council, which is assessed on merit against the LEP and the DCP.
Strathfield’s General Residential DCP, adopted 28 July 2026, replaces Parts A, B and C of the Consolidated DCP 2005 from that date. Private open space drops from 12 m² to 6 m², a new 6 m separation from the house starts, and height and parking controls are restated. Applications lodged with Council before that date keep the old rules. This is a council document, so it changes nothing on the complying development pathway.
There is no bedroom limit as such, on either pathway. On the council pathway from 1 September 2026, the new DCP sets a 70 m² minimum internal area for a 2-bedroom dwelling, which is above the 60 m² cap. We have not had it confirmed that this control is applied to granny flats, so treat it as a question to put to Council rather than a settled bar. On the fast pathway with a certifier, no minimum internal area applies and 60 m² is your cap.
Between $15,406.96 and $20,000 depending on which of the 9 precincts your block sits in, on Council’s September 2025 rate sheet. The plan is capped at $20,000 per dwelling. Confirm your precinct with Council. Note this one applies on the fast pathway as well as a DA, so it is in your budget either way.
Not on the council pathway. Strathfield requires no additional parking or driveway for a secondary dwelling, under both the current controls and the new ones. If you choose to add a space after 1 September 2026, it must not create an extra crossover from the primary road. On the fast pathway, parking comes from the state checklist, not from Council.
Strathfield’s DCP does not set one. We checked the new plan end to end and there is no lot size threshold for secondary dwellings in it. Lot size eligibility comes from the state rules, not from Council, so anyone quoting you a Strathfield specific minimum lot size is quoting something that is not in the council’s plan.
Depends on the address. Greenacre is split between Strathfield and Canterbury-Bankstown, and the contributions and DCP controls are different on each side. If you are on Davidson Street and on the Strathfield side, DCP 14 applies to your block on the council pathway and overrides the general controls where they conflict.
Still have a question?
Call 1300 060 651The rules above are the council layer, and most of them only bite if you end up at Council. The state rules on setbacks, frontage and landscaped area sit underneath them, are tiered by lot size, and are what a private certifier actually checks.
Working out which pathway your block qualifies for, and which combination of rules applies, takes your survey, your title and your planning certificate.
Or call our team on 1300 060 651
Building granny flats
Since 2012
Builder licence
247388C, verifiable through NSW Fair Trading
Industry body
Housing Industry Association member
MBA NSW Excellence in Housing Awards
Winner 2021, Winner 2023,
Finalist 2020
Completed granny flats documented on this site
70+
Approvals
CDC and DA, managed by
our planning team
Pricing
Quote within 1 business day of your site assessment, 2-bedroom from $134,990
Building granny flats
Since 2012
Builder licence
247388C, verifiable through NSW Fair Trading
Industry body
Housing Industry Association member
MBA NSW Excellence in Housing Awards
Winner 2021, Winner 2023,
Finalist 2020
Completed granny flats documented on this site
70+
Approvals
CDC and DA, managed by
our planning team
Pricing
Quote within 1 business day of your site assessment, 2-bedroom from $134,990